Skip to content

benchmarking ingest #157

benchmarking ingest

benchmarking ingest #157

Triggered via schedule February 2, 2025 09:01
Status Cancelled
Total duration 15h 49m 33s
Artifacts

ingest_benchmark.yml

on: schedule
Matrix: ingest
Fit to window
Zoom out
Zoom in

Annotations

6 errors
ingest (new_empty_project_stripe_size_2048, 2048, 16)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
ingest (new_empty_project_stripe_size_2048, 2048, 16)
The operation was canceled.
ingest (new_empty_project_stripe_size_32768, 32768, 16)
The self-hosted runner: neon-dev-06fa4000 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
ingest (new_empty_project, 16)
Process completed with exit code 2.
ingest (new_empty_project, 17)
Process completed with exit code 2.
ingest (large_existing_project, 16)
Process completed with exit code 1.