Build #742
build.yml
on: schedule
Matrix: set-kernel
Matrix: build-matrix
Report workflow success
0s
Report workflow failure
3s
Annotations
4 errors
build-matrix (el8, el8stream)
The job running on runner el9-worker-02 has exceeded the maximum execution time of 60 minutes.
|
build-matrix (el8, el8stream)
The operation was canceled.
|
build-matrix (el9, el9stream)
The job running on runner el9-worker-01 has exceeded the maximum execution time of 60 minutes.
|
build-matrix (el9, el9stream)
The operation was canceled.
|