Skip to content

Commit

Permalink
update impact acceptance criteria
Browse files Browse the repository at this point in the history
Signed-off-by: Chris de Almeida <ctcpip@users.noreply.github.com>
  • Loading branch information
ctcpip committed Oct 29, 2024
1 parent 180a18c commit bf4472a
Showing 1 changed file with 1 addition and 2 deletions.
3 changes: 1 addition & 2 deletions PROJECT_PROGRESSION.md
Original file line number Diff line number Diff line change
Expand Up @@ -216,14 +216,13 @@ Impact Stage projects are expected to participate actively in CPC proceedings, a

To graduate from At Large stage or for a new project to join as an Impact project, a project must meet the following criteria:

* Document that it is being used successfully in production by at least two independent end users which, in the CPC’s judgement, are of adequate quality and scope.
* Demonstrate that it is being used successfully in production by at least two independent end users which, in the CPC’s judgement, are of adequate quality and scope.
* Have a defined governing body of at least 5 or more members (owners and core maintainers), of which no more than 1/3 is affiliated with the same employer. In the case there are 5 governing members, 2 may be from the same employer.
* Have a documented and publicly accessible description of the project's governance, decision-making, contribution, and release processes. This is preferably laid out in a GOVERNANCE.md file and references a CONTRIBUTING.md and AUTHORS.md file showing the current and emeritus committers.
* Demonstrate a substantial ongoing flow of commits and merged contributions.
* Have a healthy number of committers from at least two organizations. A committer is defined as someone with the commit bit; i.e., someone who can accept contributions to some or all of the project.
* Adopt the Foundation Code of Conduct.
* Accept security reports and publicly disclose them after the fix has been made available.
* Have a public list of project adopters for at least the primary repo (e.g., ADOPTERS.md or logos on the project website).
* Other metrics as defined by the applying Project during the application process in cooperation with the CPC.
* Receive a supermajority vote from the CPC to move to Impact stage. Projects can move directly from At Large to Impact, if they can demonstrate sufficient maturity and have met all requirements.

Expand Down

0 comments on commit bf4472a

Please sign in to comment.