Skip to content

Upgrade to Ruby 3.2.3 #96

Upgrade to Ruby 3.2.3

Upgrade to Ruby 3.2.3 #96

Triggered via push January 18, 2024 18:58
Status Cancelled
Total duration 35m 55s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

14 errors
build-customizable
The run was canceled by @CamJN.
build-customizable
The operation was canceled.
build-ruby33
The run was canceled by @CamJN.
build-ruby33
The operation was canceled.
build-full
The run was canceled by @CamJN.
build-full
The operation was canceled.
build-ruby32
The run was canceled by @CamJN.
build-ruby32
The operation was canceled.
build-nodejs
The run was canceled by @CamJN.
build-nodejs
The operation was canceled.
build-ruby30
The run was canceled by @CamJN.
build-ruby30
The operation was canceled.
build-ruby31
The run was canceled by @CamJN.
build-ruby31
The operation was canceled.