Skip to content

point_cloud limits update 4 #483

point_cloud limits update 4

point_cloud limits update 4 #483

Triggered via push December 13, 2024 21:38
Status Failure
Total duration 3m 31s
Artifacts

actions.yml

on: push
Matrix: build-linux
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
build-linux (3.11)
Process completed with exit code 1.
build-linux (3.9)
The job was canceled because "_3_11" failed.
build-linux (3.9)
Process completed with exit code 1.
build-linux (3.10)
The job was canceled because "_3_11" failed.
build-linux (3.10)
The operation was canceled.
build-linux (3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636