Use OS trusted CA certs if not provided by the user #419
test-make.yaml
on: pull_request
Matrix: Build and Xref
Matrix: Test
Matrix: Type check
Annotations
1 error and 6 warnings
Test (26, 1.17, mnesia) / Test rabbit (parallel-ct-set-3) / rabbit (parallel-ct-set-3)
Process completed with exit code 2.
|
Build and Xref (26, 1.17)
0..-2 has a default step of -1, please write 0..-2//-1 instead
|
Build and Xref (27, 1.17)
0..-2 has a default step of -1, please write 0..-2//-1 instead
|
Test (26, 1.17, khepri) / Test plugins (rabbitmq_aws) / rabbitmq_aws (tests)
Failed to download action 'https://api.github.com/repos/erlef/setup-beam/tarball/0a541161e47ec43ccbd9510053c5f336ca76c2a2'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Test (26, 1.17, khepri) / Test plugins (rabbitmq_aws) / rabbitmq_aws (tests)
Back off 20.919 seconds before retry.
|
Test (26, 1.17, khepri) / Test plugins (rabbitmq_aws) / rabbitmq_aws (tests)
Failed to download action 'https://api.github.com/repos/erlef/setup-beam/tarball/0a541161e47ec43ccbd9510053c5f336ca76c2a2'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
Test (26, 1.17, khepri) / Test plugins (rabbitmq_aws) / rabbitmq_aws (tests)
Back off 18.196 seconds before retry.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
CT logs (rabbit parallel-ct-set-2 OTP-26 khepri)
|
11.2 MB |
|
CT logs (rabbit parallel-ct-set-3 OTP-26 khepri)
|
11.7 MB |
|
CT logs (rabbit parallel-ct-set-3 OTP-26 mnesia)
|
11.1 MB |
|
CT logs (rabbitmq_federation tests OTP-26 khepri)
|
2.84 MB |
|
CT logs (rabbitmq_jms_topic_exchange tests OTP-26 khepri)
|
467 KB |
|