plugin(bulk-import): add backstage app to workspace #61
Triggered via pull request
November 7, 2024 06:08
Status
Cancelled
Total duration
1m 18s
Artifacts
–
ci.yml
on: pull_request
Detect workspace changes
5s
Matrix: ci
Matrix: verify
check all required jobs
3s
Annotations
9 errors
Workspace bulk-import, Verify step
Canceling since a higher priority waiting request for 'CI-refs/pull/25/merge' exists
|
Workspace bulk-import, Verify step
The operation was canceled.
|
Workspace bulk-import, CI step for node 20.x
Canceling since a higher priority waiting request for 'CI-refs/pull/25/merge' exists
|
Workspace bulk-import, CI step for node 20.x
The operation was canceled.
|
Workspace noop, Verify step
Canceling since a higher priority waiting request for 'CI-refs/pull/25/merge' exists
|
Workspace noop, Verify step
The operation was canceled.
|
Workspace noop, CI step for node 20.x
Canceling since a higher priority waiting request for 'CI-refs/pull/25/merge' exists
|
Workspace noop, CI step for node 20.x
The operation was canceled.
|
check all required jobs
Process completed with exit code 1.
|