Skip to content

chore(deps): bump github.com/prometheus/client_golang #1379

chore(deps): bump github.com/prometheus/client_golang

chore(deps): bump github.com/prometheus/client_golang #1379

Status Failure
Total duration 1m 42s
Artifacts

test.yml

on: push
Matrix: Test
Matrix: Benchmark
Matrix: Test latest
post-tests
0s
post-tests
Build docker image
0s
Build docker image
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Test (1.22, ubuntu-latest)
Process completed with exit code 2.
Test (1.21, ubuntu-latest)
The job was canceled because "_1_22_ubuntu-latest" failed.
Test (1.21, ubuntu-latest)
The operation was canceled.
Test latest (ubuntu-latest)
Process completed with exit code 2.
Test (1.23, ubuntu-latest)
The job was canceled because "_1_22_ubuntu-latest" failed.
Test (1.23, ubuntu-latest)
The operation was canceled.