Skip to content

chore(deps): bump github.com/prometheus/client_golang from 1.19.1 to 1.20.3 #1380

chore(deps): bump github.com/prometheus/client_golang from 1.19.1 to 1.20.3

chore(deps): bump github.com/prometheus/client_golang from 1.19.1 to 1.20.3 #1380

Triggered via pull request September 6, 2024 10:35
Status Failure
Total duration 1m 36s
Artifacts

test.yml

on: pull_request
Matrix: Test
Matrix: Benchmark
Matrix: Test latest
post-tests
0s
post-tests
Build docker image
0s
Build docker image
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Test (1.21, ubuntu-latest)
Process completed with exit code 2.
Test (1.22, ubuntu-latest)
The job was canceled because "_1_21_ubuntu-latest" failed.
Test (1.22, ubuntu-latest)
Process completed with exit code 2.
Test (1.23, ubuntu-latest)
The job was canceled because "_1_21_ubuntu-latest" failed.
Test (1.23, ubuntu-latest)
The operation was canceled.
Test latest (ubuntu-latest)
Process completed with exit code 2.