Skip to content

updating action

updating action #74

Triggered via push January 31, 2025 21:55
Status Failure
Total duration 5m 36s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (1)
Process completed with exit code 1.
build (2)
The job was canceled because "_1" failed.
build (2)
The operation was canceled.
build (3)
The job was canceled because "_1" failed.
build (3)
The operation was canceled.
build (4)
The job was canceled because "_1" failed.
build (4)
The operation was canceled.
build (5)
The job was canceled because "_1" failed.
build (5)
The operation was canceled.