Migrate validator client to clap derive #18742
Triggered via pull request
October 16, 2024 15:54
Status
Cancelled
Total duration
11m 9s
Artifacts
–
test-suite.yml
on: pull_request
Check for 'skip-ci' label
0s
lockbud
10m 43s
target-branch-check
0s
check-code
8m 52s
check-msrv
5m 8s
release-tests-ubuntu
6m 33s
release-tests-windows
10m 33s
beacon-chain-tests
10m 41s
op-pool-tests
10m 41s
network-tests
10m 40s
slasher-tests
1m 29s
debug-tests-ubuntu
7m 45s
state-transition-vectors-ubuntu
6m 5s
ef-tests-ubuntu
7m 44s
basic-simulator-ubuntu
10m 39s
fallback-simulator-ubuntu
10m 39s
execution-engine-integration-ubuntu
10m 41s
cargo-udeps
7m 17s
compile-with-beta-compiler
10m 37s
cli-check
7m 54s
test-suite-success
0s
Annotations
21 errors
release-tests-ubuntu
Process completed with exit code 2.
|
cargo-udeps
Process completed with exit code 2.
|
cli-check
Process completed with exit code 2.
|
lockbud
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
lockbud
The operation was canceled.
|
fallback-simulator-ubuntu
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
fallback-simulator-ubuntu
The operation was canceled.
|
release-tests-windows
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
release-tests-windows
The operation was canceled.
|
compile-with-beta-compiler
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
compile-with-beta-compiler
The operation was canceled.
|
basic-simulator-ubuntu
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
basic-simulator-ubuntu
The operation was canceled.
|
network-tests
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
network-tests
The operation was canceled.
|
op-pool-tests
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
op-pool-tests
The operation was canceled.
|
beacon-chain-tests
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
beacon-chain-tests
The operation was canceled.
|
execution-engine-integration-ubuntu
Canceling since a higher priority waiting request for 'test-suite-refs/pull/6300/merge' exists
|
execution-engine-integration-ubuntu
The operation was canceled.
|