Skip to content

update packages

update packages #97

Triggered via push January 27, 2025 20:50
Status Failure
Total duration 6h 0m 33s
Artifacts 2

test.yml

on: push
Matrix: test-android
Matrix: test-ios
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
test-android (10.1in WXGA (Tablet))
55 tests passed, 3 failed.
test-android (10.1in WXGA (Tablet))
The process '/usr/bin/sh' failed with exit code 1
test-android (pixel_6)
The job was canceled because "_10_1in_WXGA__Tablet_" failed.
test-android (pixel_6)
The operation was canceled.
test-ios (iPad Pro (12.9-inch))
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
test-ios (iPad Pro (12.9-inch))
The operation was canceled.
test-android (10.1in WXGA (Tablet))
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
screenshots_ios_iPhone 15 Pro Max Simulator
911 KB
screenshots_ios_iPhone SE
455 KB