First-pass background motor board controller #158
Annotations
19 errors
test (windows-latest, 3.12)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
|
test (windows-latest, 3.12)
The operation was canceled.
|
test (windows-latest, 3.8)
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 360 minutes.
|
test (windows-latest, 3.8)
The operation was canceled.
|
test (ubuntu-latest, 3.8)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.8)
The operation was canceled.
|
test (ubuntu-latest, 3.12)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.12)
The operation was canceled.
|
test (ubuntu-latest, 3.9)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.9)
The operation was canceled.
|
test (ubuntu-latest, 3.11)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.11)
The operation was canceled.
|
test (ubuntu-latest, 3.10)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 360 minutes.
|
test (ubuntu-latest, 3.10)
The operation was canceled.
|
test (macos-latest, 3.12)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 360 minutes.
|
test (macos-latest, 3.12)
The operation was canceled.
|
test (macos-latest, 3.8)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 360 minutes.
|
test (macos-latest, 3.8)
The operation was canceled.
|
test (macos-latest, 3.8)
[notice] A new release of pip is available: 21.1.1 -> 24.2
[notice] To update, run: python3.8 -m pip install --upgrade pip
|