Skip to content

Supply gcs-connector options from default Configuration #2251

Supply gcs-connector options from default Configuration

Supply gcs-connector options from default Configuration #2251

Triggered via pull request January 22, 2025 21:24
Status Failure
Total duration 17m 13s
Artifacts

ci.yml

on: pull_request
Matrix: Test
Matrix: Test Legacy Avro
Matrix: Test Coverage
Matrix: Submit Dependencies
Matrix: Integration Test
Matrix: Generate Site
Matrix: Validate Steward Config
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Generate Site (ubuntu-22.04, 2.13, corretto@11)
Process completed with exit code 1.
Test (ubuntu-22.04, 2.13, corretto@11)
Process completed with exit code 1.
Test (ubuntu-22.04, 2.13, corretto@17)
The job was canceled because "ubuntu-22_04_2_13_corrett" failed.
Test (ubuntu-22.04, 2.13, corretto@17)
The operation was canceled.
Test (ubuntu-22.04, 2.13, corretto@21)
The job was canceled because "ubuntu-22_04_2_13_corrett" failed.
Test (ubuntu-22.04, 2.13, corretto@21)
The operation was canceled.
Test (ubuntu-22.04, 2.12, corretto@11)
The job was canceled because "ubuntu-22_04_2_13_corrett" failed.
Test (ubuntu-22.04, 2.12, corretto@11)
The operation was canceled.
Test Coverage (ubuntu-22.04, 2.13, corretto@11)
Process completed with exit code 1.