Skip to content

Refactoring, contract dsl wasm compatibility, encode/decode fixes. #240

Refactoring, contract dsl wasm compatibility, encode/decode fixes.

Refactoring, contract dsl wasm compatibility, encode/decode fixes. #240

Re-run triggered November 15, 2023 09:28
Status Failure
Total duration 6h 0m 31s
Artifacts

ci.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

2 errors
macos-amd64 (Nim version-2-0)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 360 minutes.
macos-amd64 (Nim version-2-0)
The operation was canceled.