Skip to content

Merge pull request #1 from TheMrSheldon/main #1

Merge pull request #1 from TheMrSheldon/main

Merge pull request #1 from TheMrSheldon/main #1

Triggered via push July 17, 2024 07:39
Status Failure
Total duration 2m 51s
Artifacts

tests.yml

on: push
Matrix: run-tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
run-tests (3.9)
Process completed with exit code 1.
run-tests (3.10)
The job was canceled because "_3_9" failed.
run-tests (3.10)
Process completed with exit code 1.
run-tests (3.12)
The job was canceled because "_3_9" failed.
run-tests (3.12)
Process completed with exit code 1.
run-tests (3.11)
The job was canceled because "_3_9" failed.
run-tests (3.11)
The operation was canceled.