Skip to content

add target normalization #2

add target normalization

add target normalization #2

Triggered via push July 17, 2024 08:32
Status Failure
Total duration 2m 52s
Artifacts

tests.yml

on: push
Matrix: run-tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
run-tests (3.10)
Process completed with exit code 1.
run-tests (3.9)
The job was canceled because "_3_10" failed.
run-tests (3.9)
The operation was canceled.
run-tests (3.12)
The job was canceled because "_3_10" failed.
run-tests (3.12)
The operation was canceled.
run-tests (3.11)
The job was canceled because "_3_10" failed.
run-tests (3.11)
The operation was canceled.