Skip to content

build: upgrade to latest bazel 7.3.2 #2056

build: upgrade to latest bazel 7.3.2

build: upgrade to latest bazel 7.3.2 #2056

Triggered via pull request October 19, 2024 07:42
Status Cancelled
Total duration 1m 15s
Artifacts

ci.yaml

on: pull_request
matrix-prep
3s
matrix-prep
Matrix: test
Matrix: test-worker
conclusion
3s
conclusion
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
test (7, 7.3.2, 0, ubuntu, .)
Canceling since a higher priority waiting request for 'concurrency-group::CI::pr-718' exists
test (7, 7.3.2, 1, ubuntu, .)
Canceling since a higher priority waiting request for 'concurrency-group::CI::pr-718' exists
test (7, 7.3.2, 1, ubuntu, .)
The operation was canceled.
test-worker (7, 7.3.2)
Canceling since a higher priority waiting request for 'concurrency-group::CI::pr-718' exists
test-worker (7, 7.3.2)
The operation was canceled.
conclusion
The following actions use a deprecated Node.js version and will be forced to run on node20: technote-space/workflow-conclusion-action@45ce8e0eb155657ab8ccf346ade734257fd196a5. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/