Skip to content

Merge resolution

Merge resolution #51

Triggered via push October 10, 2023 06:19
Status Failure
Total duration 6m 25s
Artifacts
Matrix: test_linux
Matrix: test_macos
Fit to window
Zoom out
Zoom in

Annotations

14 errors
test_linux (ubuntu:22.10)
Process completed with exit code 100.
test_linux (fedora:34)
The job was canceled because "ubuntu_22_10" failed.
test_linux (fedora:34)
The operation was canceled.
test_linux (fedora:35)
The job was canceled because "ubuntu_22_10" failed.
test_linux (fedora:35)
The operation was canceled.
test_linux (ubuntu:22.04)
The job was canceled because "ubuntu_22_10" failed.
test_linux (ubuntu:22.04)
The operation was canceled.
test_linux (ubuntu:20.04)
The job was canceled because "ubuntu_22_10" failed.
test_linux (ubuntu:20.04)
The operation was canceled.
test_linux (ubuntu:18.04)
The job was canceled because "ubuntu_22_10" failed.
test_linux (ubuntu:18.04)
The operation was canceled.
test_linux (fedora:36)
The job was canceled because "ubuntu_22_10" failed.
test_linux (fedora:36)
The operation was canceled.
test_windows
Process completed with exit code 1.